Tooling Developing Procedure
All
Tooling Developing Procedure
Plastic Mold Operation Manual
Longxiang Basic Terms
Plastic basic information
Plastic material basic information
Plastic mold basic information

Tooling Developing Procedure

What's the tooling developing procedure in Longxiang?

Golden 24 hours principle                            ----all the responses should be done within 24 hours!Step.1   订单       Order Step.2   开模分析       DFMEA  Step.3   模具设计要求      Tooling BOM Form Step.4   模具 2D 图纸     Tooling 2D DrawingStep.5    开工通知单      Cutting Tooling Notice Step.6    生产进度表       Weekly Report Step.7    模具3D       Tooling  3D drawing Step.8    检测报告      Dimension Report of T1 sampleStep.9    箱麦        Packing Information Step.10   走模光碟   CDStep.11   顶出机构测试 3000 cycles testing for tooling ejecting systemStep.12  模具测试手册       Plastic Mould Operation Manual 

Tooling Developing Procedure--1

Step.1  订单 Order1. 确认订单 Confirm Order2. 出示发票  Issuer PI3. 产品图纸&要求 下达工程  Provide Engineers with part drawings   and special requirements

Tooling developing Procedure--2

Step.2    开模分析   DFMEADFMEA(Design Failure Mode & Effect Analysis ) should be prepared before the 2D tooling design ,which should include P/L, Gate location, Ejector pins and the basic structure of tooling as well as the comments for any parts design defects.  This is a good way to save much time and cost for tooling design and fabrication.

Tooling developing Procedure---2.1

DFMEA REPORT SHOW

Tooling developing Procedure---2.2

DFMEA REPORT SHOW 

Tooling developing Procedure--3

BOM Form

Tooling developing Procedure--4

Tooling 2D drawing

Tooling developing Procedure--5

Cutting Tooling Noticd

Tooling developing Procedure--6

Weekly Report

Tooling developing Procedure--7

3D drawing

Tooling developing Procedure--8

Dimension Report of T1

Tooling developing Procedure--9

Packing Information

Tooling developing Procedure--10

CDContents:           1.  Tooling  2D            2.  Tooling 3D          3.   检查报告 Dimension Report          4.   照片     Photograph          5.   录像     Video

Tooling developing Procedure--11

3000 cycles testing for tooling ejecting system