What's the tooling developing procedure in Longxiang?
Golden 24 hours principle ----all the responses should be done within 24 hours!Step.1 订单 Order Step.2 开模分析 DFMEA Step.3 模具设计要求 Tooling BOM Form Step.4 模具 2D 图纸 Tooling 2D DrawingStep.5 开工通知单 Cutting Tooling Notice Step.6 生产进度表 Weekly Report Step.7 模具3D Tooling 3D drawing Step.8 检测报告 Dimension Report of T1 sampleStep.9 箱麦 Packing Information Step.10 走模光碟 CDStep.11 顶出机构测试 3000 cycles testing for tooling ejecting systemStep.12 模具测试手册 Plastic Mould Operation Manual